Project description |
Site of project performance |
Time of project performance |
Customer |
Construction activities in the project for putting the “Déva-3” CH-well into production |
Hungary |
2008 |
Magyar Horizont Energia Kft. |
Manufacturing of three-phase skid mounted natural gas separator units |
Hungary |
2008 |
Petro Hungária Kft. |
Implementation of the putting into production of the “HHE Déva-3/B” gas well and the connection of the “HHE Déva-1” well |
Hungary |
2008 |
Magyar Horizont Energia Kft. |
Manufacturing of glycol regeneration unit for the “Szőreg-1” underground security gas storage and gas handling plant |
Szőreg, Hungary |
2008 |
Global Process Systems Ltd.. Dubai |
“Szőreg-1” underground security gas storage and gas handling plant – manufacturing of receiving separators and glycol degassing tanks |
Szőreg, Hungary |
2008 |
Global Process Systems Ltd.. Dubai |
Manufacturing of high-pressure heat exchangers |
Hungary |
2008 |
DKG-EAST Zrt. |
Algyő Gas Plant, H-410 water-gas heat exchanger: manufacturing |
Algyő, Hungary |
2008 |
MOL Nyrt. |
Barcs-Ny Gas Plant – storage tank pool: construction of contamination preventing units |
Hungary |
2008 |
MOL Nyrt |
“Szőreg-1” underground security gas storage and gas handling plant – Propane storage tank manufacturing |
Algyő, Hungary |
2008 |
Global Process Systems Ltd. |
Public road CO2 filling point, machinery installation |
Répcelak, Hungary |
2008 |
Linde Gáz Zrt. |
MOL Nyrt., Zala Refinery, heat exchanger pipe bundle manufacturing |
Zalaegerszeg, Hungary |
2008 |
MOL Nyrt. |
Putting the Körösújfalu, Okány and Zsadány gas fields into production, connection of the “Zsadány-É-1” well, gas dryer manufacturing |
Hungary |
2008 |
Útvasút-Szeged Kft. |
Budafa BT-3 tank pool reconstruction, machinery installation |
Hungary |
2008 |
MOL Nyrt. |
Putting the Körösújfalu, Okány and Zsadány gas fields into production, Glycol dryer, Methanol tank manufacturing |
Hungary |
2008 |
Petrolteam Kft. |
Ferencszállás DSD natural gas separator upper part replacement |
Hungary |
2008 |
MOL Nyrt. |
Installation of a regulating valve in the Babócsa gathering line |
Babócsa, Hungary |
2008 |
MOL Nyrt. |
“Szőreg-1” underground security gas storage and gas handling plant – liquid separators |
Algyő, Hungary |
2008 |
MOL Nyrt. |
Algyő Gas Plant – pressure booster technology, CC2 III. Phase, cyclone separator manufacturing |
Algyő, Hungary |
2008 |
MOL Nyrt. |
Algyő Gas Plant – pressure booster technology, CC2-MC2 I Phase “S-407” cyclone separator manufacturing |
Algyő, Hungary |
2008 |
MOL Nyrt. |
Putting the “Endrőd-1” natural gas well into production |
Hungary |
2008 |
Magyar Horizont Energia Kft. |
“Szőreg-1” underground security gas storage and gas handling plant – technology installation Technology installation |
Algyő, Hungary |
2009 |
OTF Fővállalkozó Zrt. |
Dunai Kőolaj Finomító (“Duna Crude Oil Refinery”), HCK/DF distillation plants: capacity increase, manufacturing of a mazout heat exchanger |
Százhalombatta, Hungary |
2009 |
OTF Fővállalkozó Zrt. |
Bajánsenye-Őriszentpéter gas field, pressure boosting of produced gas: technology installation |
Hungary |
2009 |
Pannon Petróleum Kft. |
Construction of the “Déva-2” CH- gathering station and the “Gyoma-2” well lines; building construction and machinery installation activities on the “Déva-2” gathering station |
Hungary |
2009 |
Magyar Horizont Energia Kft. |
“Déva-2” natural gas gathering station: manufacturing of skid mounted equipment |
Hungary |
2009 |
Magyar Horizont Energia Kft. |
Installation of a gas pipe between the “Endrőd-1” natural gas well and the “Gyoma-2” drilling point |
Hungary |
2009 |
Magyar Horizont Energia Kft. |
Gas processing plant in Hajdúnánás: construction, manufacturing of custom-made equipment, supply of gas technology machinery |
Hungary |
2009 |
Magyar Horizont Energia Kft. |
Construction of the gas pipeline between the Hajdúnánás Gas Processing Plant and the Tiszavasvári Sectioning Station |
Hungary |
2009 |
Magyar Horizont Energia Kft. |
Building construction and machinery installation activities in Phase II of the “Déva-2” CH- gathering station project |
Hungary |
2009 |
Magyar Horizont Energia Kft. |
“Hosszúpályi-Dél” natural gas handling station pressure boosting project |
Hosszúpályi, Hungary |
2009 |
MOL Nyrt. |
Csombárd natural gas handling station: “E-200” gas-gas heat exchanger installation |
Csombárd, Hungary |
2009 |
MOL Nyrt. |
Putting the “Túrkeve-D-1” gas well into production |
Hungary |
2009 |
Magyar Horizont Energia Kft. |
Putting the “Hajdúnánás-2” gas well into production |
Hungary |
2009 |
HHE North Kft. |
“Hosszúpályi-Dél” gas handling station, pressure boosting project, condensate tank manufacturing |
Hosszúpályi, Hungary |
2009 |
MOL Nyrt. |
“Túrkeve-D-1” and “Görbeháza-1”: manufacturing of gas handling stations and technology apparatuses |
Hungary |
2009 |
Magyar Horizont Energia Kft. |
Test production from the “Pen-101”, “-105” natural gas wells, pipeline and equipment installation works, pressure testing, cathode protection, landscape restoration |
Hungary |
2010 |
Petro Hungária Kft. |
Putting the “Tét-3” gas well into production |
Hungary |
2010 |
TÉT-3 GÁZKÚT Termelő és Kereskedelmi Kft. |
Installation of a condensate tank in the Hajdúnánás gas processing plant |
2010 |
HHE North Kft. |
|
Putting the Vízvár-Észak Gas Field into production |
Hungary |
2010 |
MOL Nyrt. |
Üllés gas plant – supply of an alkaline desulphurisation unit |
Üllés, Hungary |
2010 |
MOL Nyrt. |
Technology reconstruction of the field gas handling unit in Babócsa |
Babócsa, Hungary |
2010 |
MOL Nyrt. |
Oil field exploration project in Gomba |
Gomba, Hungary |
2010 |
MOL Nyrt. |
Crude oil gathering system central plant in Algyő, “E-2002” emulsion breaking tank, roof replacement |
Algyő, Hungary |
2010 |
MOL Nyrt. |
Babócsa CH-gathering station, “GB-12/a” water elimination well line section replacement |
Babócsa, Hungary |
2010 |
MOL Nyrt. |
Construction of a fire embankment and a protection pit in the “BT-2” oil gathering site |
Hungary |
2010 |
MOL Nyrt. |
Putting the “TóD-4” oil well into production, as part of the Tóalmás oil gathering station field development project |
Hungary |
2010 |
MOL Nyrt. |
Putting the “Túrkeve-Ny13” and “Túrkeve-Ny5” natural gas wells into production |
Hungary |
2010 |
Magyar Horizont Energia Kft. |
Installation of a new gas odouring technology in the Bajcsa CH-gathering station |
Bajcsa, Hungary |
2010 |
MOL Nyrt. |
Installation of a new gas odouring technology in the Csombárd gas handling unit |
Csombárd, Hungary |
2010 |
MOL Nyrt. |
Manufacturing of a column tank for the “Sávoly DKT-1” gathering station |
Sávoly, Hungary |
2010 |
MOL Nyrt. |
Gomba crude oil gathering station field exploration project, “CS-01”, “CS-02”, “FCS-01” mist eliminators and Samson post |
Gomba, Hungary |
2010 |
MOL Nyrt. |
Pusztaederics underground gas storage unit - gas technology – skid mounted metering separator manufacturing |
Pusztaederics, Hungary |
2010 |
E.ON Földgáz Storage Zrt. |
Installation of machinery required to turn the distillate collection system of Linde Gáz Zrt. into a closed system |
2010 |
Linde Gáz Zrt. |
|
“W11” heat exchanger lining manufacturing |
Szlovákia |
2011 |
TES Armatúry s.r.o. 824 12 Bratislava |
Manufacturing of a slug catching separator for the Babócsa gas handling plant |
Hungary |
2011 |
Magyar Horizont Energia Kft. |
Three-phase natural gas separator, skid mounted unit manufacturing |
Hungary |
2011 |
Magyar Horizont Energia Kft. |
“Túrkeve Ny-5” CH-gathering station, Phase 1: building construction and machinery installation activities |
Hungary |
2011 |
Magyar Horizont Energia Kft. |
Modified machinery, electrical and instrument installation in Phase 1 (in preparation of Phase 2) of the “Túrkeve Ny-5” CH gathering station project |
Hungary |
2011 |
Magyar Horizont Energia Kft. |
“Túrkeve Ny-5” gathering station: manufacturing of a skid mounted double body natural gas separator |
Hungary |
2011 |
Magyar Horizont Energia Kft. |
Pusztaederics underground gas storage unit – heat exchangers’ pipe coils: replacement |
Pusztaederics, Hungary |
2011 |
E.ON Földgáz Storage Zrt. |
Construction activities in the Babócsa-Fánimajor natural gas handling station |
Hungary |
2011 |
Magyar Horizont Energia Kft. |
Replacement of the pipe section in the well region |
Répcelak, Hungary |
2011 |
Linde Gáz Zrt. |
Manufacturing of a boiling pipe bundle for the Ortaháza natural gas plant |
Ortaháza, Hungary |
2011 |
Technoszer Kft. |
Condenser pipe bundle replacement |
Répcelak, Hungary |
2011 |
Linde Gáz Zrt. |
Manufacturing of a 50-m3 confined groundwater tank for the “Déva-2” CH-gathering station |
Hungary |
2011 |
Magyar Horizont Energia Kft. |
Törökkoppány: gas plant construction |
Pakistan |
2011 |
Winstar Magyarország Kft. |
Modified machinery, electrical and instrument installation in Phase 2 of the “Túrkeve Ny-5” CH-gathering station project |
Hungary |
2011 |
Magyar Horizont Energia Kft. |
Manufacturing of a skid mounted S-02 separator in the Tura field development project |
Hungary |
2011 |
MOL Nyrt. |
Installation of a booster compressor at the Füzesgyarmat central CH gathering plant |
Füzesgyarmat, Hungary |
2011 |
Magyar Horizont Energia Kft. |
Technology reconstruction required to enable the inspection of the flare stack separator of the Algyő Gas Plant and Crude Oil Gathering System Central Plant |
Algyő, Hungary |
2011 |
MOL Nyrt. |
Manufacturing of 4000L/6 bar pressure container |
Hungary |
2011 |
Groundfos Manufacturing Hungary Kft. |
“T-203” tank renewal at the “NLT-3” gathering station |
Hungary |
2011 |
MOL Nyrt. |
Manufacturing of a skid mounted condensate stabilising unit, as part of the Szank Gas Plant energy rationalisation project |
Kiskunhalas, Hungary |
2011 |
MOL Nyrt. |
“TRV-01” tank renewal at the Algyő Crude Oil Gathering System Central Plant |
Algyő, Hungary |
2011 |
MOL Nyrt. |
Manufacturing of a skid mounted test production separator |
Hungary |
2012 |
Geoinform Kft. |
Commissioning of the “Beru-4” natural gas well, manufacturing and delivery to site of production equipment |
Hungary |
2012 |
MOL Nyrt. |
Planning and manufacturing of a blow-off, gas gathering and handling system container unit |
Hungary |
2012 |
Magyar Horizont Energia Kft. |
Planning and manufacturing of a three-phase natural gas separator container unit |
2012 |
Magyar Horizont Energia Kft. |
|
Manufacturing of a drilling pipe transportation frame |
Hungary |
2012 |
RIG Service Zrt. |
Manufacturing of technology tanks, filters and separators for the “Ócsa T-1” crude oil gathering station, partly through the reconstruction of exiting units |
Ócsa, Hungary |
2012 |
MOL Nyrt. |
Installation of a portable natural gas production equipment and manufacturing of equipment |
Hungary |
2012 |
Magyar Horizont Energia Kft. |
Planning and manufacturing of a 60-m3 tank for a CH production system |
Hungary |
2012 |
Magyar Horizont Energia Kft. |
Tura Field development – Tura crude oil gathering station technology: machinery reconstruction |
Tura, Hungary |
2012 |
MOL Nyrt. |
Ócsa gathering station, manufacturing of a 1.2-m3 tank |
Ócsa, Hungary |
2012 |
IFEX Tűzvédelmi Kft. |
Manufacturing and installation of the T-20 condensate, confined groundwater tank and skid mounted unit of a portable natural gas production equipment |
Hungary |
2012 |
Magyar Horizont Energia Kft. |
“Szőreg-1” underground security gas storage plant, external gathering stations SzBT-2-3-4 metering separator flange relocation |
Algyő, Hungary |
2012 |
MOL Nyrt. |
Adria Oil Pipeline, Csurgó pump station, “04” column tank: replacement, planning and implementation |
Csurgó, Hungary |
2012 |
MOL Nyrt. |
“Túrkeve Ny-5” CH gathering station, 60-m3 heatable water tank: planning, manufacturing and on-site insulation |
Túrkeve, Hungary |
2012 |
Magyar Horizont Energia Kft. |
Mezősas natural gas field: installation of an auxiliary house system |
Hungary |
2012 |
MOL Nyrt |
Manufacturing of natural gas cyclone separators |
Hungary |
2012 |
Marketinfo Műszaki és BefektetésivTanácsadó Bt. |
Three-phase well test separator manufacturing |
Hungary |
2012 |
Geoinform Kft. |
“Túrkeve - Ny-5” CH gathering station, T-20 condensate, confined groundwater skid mounted unit: manufacturing |
Túrkeve, Hungary |
2012 |
Magyar Horizont Energia Kft. |
“T-1001” tank renewal at the Kiskunhalas crude oil gathering system central plant |
Hungary |
2012 |
MOL Nyrt. |
Fánimajor gas gathering station, Cameron compressors: electrical and control technology installation activities |
Hungary |
2012 |
Magyar Horizont Energia Kft. |
Fánimajor Cameron compressor: machinery installation activities |
Hungary |
2012 |
Magyar Horizont Energia Kft. |
40-m3 tank body manufacturing |
Nagykanizsa, Hungary |
2012 |
RIG Service Zrt. |
“Istvándi-2” oil well connection |
Istvándi, Hungary |
2012 |
Magyar Horizont Energia Kft. |
“Sávoly DKT-1” oil gathering station: renewal of the “T-201” emulsion breaker and the “T-203” oil tank |
Sávoly, Hungary |
2013 |
MOL Nyrt. |
“Jánosmajor-3” natural gas well flare stack line: electric heating |
Jánosmajor, Hungary |
2013 |
Technoszer Kft. |
Manufacturing of a T-52 tank for the “Túrkeve- Ny -5” CH gathering centre |
Túrkeve, Hungary |
2013 |
Magyar Horizont Energia Kft. |
Installation of a container-contained boiler house for the Fánimajor oil gathering facility |
Istvándi, Hungary |
2013 |
Magyar Horizont Energia Kft. |
Installation of technology lines for the booster compressor to be installed at the “PEN-101” gathering station |
Penészlek, Hungary |
2013 |
GanzAir Kft. |
Manufacturing of “DF-01” Dugófogó separator, as part of the project for putting the “Tófej-1” gas well into production |
Ortaháza, Hungary |
2013 |
MOL Nyrt. |
Babócsa gas processing unit – gas technology – PR-400 glycol regenerator, lower vessel replacement, Csombárd gas processing unit, PR-100 glycol regenerator lower vessel replacement |
Babócsa, Hungary |
2013 |
MOL Nyrt. |
Fánimajor oil gathering unit: Machinery, control technology and electrical jobs, Manufacturing of custom-made equipment and tanks, Technology related machinery, Control technology, Electric power supply, external lighting, lightning protection, Construction activities for technology installation |
Istvándi, Hungary |
2013 |
Magyar Horizont Energia Kft. |
At the “Pen -101” gathering station: installation of a booster compressor |
Penészlek, Hungary |
2013 |
PetroHungária Kft. |
Algyő Alsópannon field development project: pipeline section replacement; trunk pipes between SzG-6/A - SzG-6 and the SzG-6 old water elimination section |
Hungary |
2013 |
MOL Nyrt. |
Installation of a DN 100 pipeline between the Jánosmajor-2 and Fánimajor gathering stations |
Hungary |
2013 |
Magyar Horizont Energia Kft. |
At the Répcelak site of Linde Gáz Magyarország Zrt.: replacement of the CO2 and NH3 pipelines |
Répcelak, Hungary |
2013 |
Linde Gáz Magyaroszág Zrt. |
Hungarian-Slovakian DN800 PN75 natural gas transmission pipeline: technology installation jobs |
Hungary |
2013 |
Vabeko Kft. |
Oil gathering station in Gomba: manufacturing of a droplet separator |
Gomba, Hungary |
2013 |
MOL Nyrt. |
Solymár - Pilisvörösvár DN400 gas transmission pipeline installation and equipment installation works |
Hungary |
2013 |
Pannon Nívó Építő Zrt. Aranyhid Konzorcium |
Combustible gas DN150 pipeline: planning and installation |
Répcelak, Hungary |
2013 |
Linde Gáz Magyaroszág Zrt. |
R-67, R-68 High-pressure pipeline system manufacturing |
Hungary |
2013 |
Rotary Fúrási Zrt. |
Test production system: 50-m3 tank renewal |
Hungary |
2013 |
Geoinform Kft. |
Separator lines: repairing |
Hungary |
2013 |
Rotary Fúrási Zrt. |
“Tófej-1” gas well region and well connection pipeline installation |
Tófej, Hungary |
2013 |
MOL Nyrt. |
Százhalombatta – Szajol “DN300” chemical industry product line |
Hungary |
2013 |
MOL Nyrt. |
Százhalombatta – Szajol “DN300” chemical industry product line |
Hungary |
2013 |
MOL Nyrt. |
Yemen block S-2 Oilfield Habban EPF-3 and EPF-4 gathering stations |
Yemen |
2013 - 2014 |
OMV Yemen |